KOGI WEST: KARIMI; THE TRENDING IDEOLOGY.


It is believed by all except a misguided few that the Hon Sunday Karimi ambition to run for the Kogi west senatorial seat was solely born out of his continents desires to continue enjoying the good legacies he has acheived while in the green chambers.

 

A critical assessment of his impacts and achievement while in the state and federal house of representative, representing Yagba federal constituency has wowed alot of positive thinking minds and has made other constituents jealous of Yagba federal constituency. during his time.it will be right to say Yagba federal constituency still enjoy some of his dividends till date.

I must indeed salute all for this brave movement which is a very bold step toward purging the menace of bad and selfish people.

The Karimi movement, I must say is mostly sacrificial, in the sense that nobody is thinking of what to get from the movement but rather, what he or she will bring to the table. this I must say is the right step at the right direction.

few of Hon Sunday Karimi achievement as a formal Yagba federal constituency house of representative member

Also Read This:  Kogi Guber: SSA Students Affairs Congratulates Gov. Bello, Alhaji Ododo On Successful Conduct, Emergence of APC Flagbearer

(A) PROJECTS AND AREAS OF INTERVENTION BY HON. SUNDAY KARIMI SINCE
ASSUMPTION OF OFFICE ON 6THJUNE 2011.

1. WATER PROJECTS:
(I) Hand pump boreholes that were hitherto inoperative were rehabilitated and converted to Motorised Boreholes with Solar Powered, UPVC tanks, and fetching point across the Federal Constituency:

This Project was self financed by the Honourable.
STAGE: the above mentioned projects have been successfully completed and handed over to the beneficiary Communities.

? Construction of Hand Pump Boreholes in over 20 Communities within the Federal Constituency, namely :

STAGE: The above stated projects have been Completed and handed over to the beneficiary Communities.

This project was self financed by the Honourable.

? New Motorised Boreholes installed with UPVC TANK and SOLAR POWERD were constructed in:
* Jege
* Igbaruku
* Egbe tuntun
* Aiyeteju Amuro

These projects have now been completed totally and they have been handed over to the beneficiary Communities.

? TOWNSHIP WATER SCHEME:
The Township Water Scheme in Isanlu, Egbe and Ife-Olukotun are being rehabilitated. The Project which was an initiative of the Hon. Member is under the Lower Niger River Basin.
Isanlu Water Scheme which has been down for over five(5)years is now operational dispensing water at least 80percent of the populace in the last six (6) months. The Project has attained sixty (60%) percent completion.

Also Read This:  NSCDC Commandant, Gandi Pledges synergy with Monarchs to End insecurity in Kogi.

?Iwelle Water Works Rehabilitation Project in Egbe, Yagba West Local Government Area, Kogi State. It has reached 60percent completion.
The Ife Olukotun Water Scheme is also about fifty(50%)percent completed.
2. ELECTRICITY PROJECTS:
(i) The Omo-Owa Mopo Extension Project which was initiated 12 years ago with provision of Transformer by the Government and abandoned has been completed 100percent and now serving the residents of Omo-Owa Mopo, Isanlu, the Project was self financed by Hon. Karimi.
(ii) Ofin Isanlu Transformer and Extension Project, an initiative of the Honourable Member, has been completed under the 2012 Appropriation Act and now fully functional.
(iii) Ejuku Transformer and Extension Project under the 2012 Appropriation initiated by the Honourable Member is 100 percent completed.
(iv) Egbe Transformer and Extension Project is 100 percent completed under the 2012 Appropriation Act.
(V) Solar Street Lightnings across Yagba federal constituency

Also Read This:  PDP IS DEAD REPLY: Barr. Zacchaeus Dare Michael: A Hungry Political Scavenger Goofed Again!

Under the 2013 Appropriation Act, the Following Projects were initiated:
(I) 10 Number Solar Powered Motorised Boreholes spread across the Communities under the Lower Niger Basin- Appropriated and Approved at N 50 Million Naira. The beneficiary Communities are:

(II) 34 poles of Solar Street Lightening Spread across Communities under the Lower Niger River Basin-Appropriated and Approved atN 30 Million Naira.
(iii) Supply of Nine (9) number of 500KVA Transformer in the following Communities, through MDG office:

(iv) Contract Award for the Completion of Rural Electrification Project for Okunran/Okoloke/Isanlu Essa, Kogi State.
This Project was initiated about twelve years ago, but abandoned since 2004. However, Hon. Karimi, working with Senator Smart Adeyemi, facilitated the commencement of work on the project through its inclusion in the 2013 Appropriation Act. A sum 40Million Naira was appropriated for it in the 2013 Appropriation Act. The two Leaders are working to get N50 Million in 2014 Budget

We’ll be bringing you more of his achievement

Karimi is tested and trusted


Leave a Reply

Your email address will not be published. Required fields are marked *